All-Sky Camera Installation Guide
Plan a CELESTRA All-Sky Pro installation with a clear horizon, secure mounting, power and Wi-Fi checks, and a recording verification procedure.
Updated
Select the observing position
Choose a position with a clear view of the sky and identify nearby lamps, roof edges and trees that could affect images. Use the confirmed mounting drawing to plan mechanical clearance and access for maintenance. Arrange the solar panel so it can receive available sunlight without obstructing the camera view.
Confirm the site requirements
The All-Sky Pro page specifies a 200 mm enclosure diameter, 250 mm body height, 100 mm dome height and a 250 × 200 mm solar panel. Confirm the installed hardware, mounting loads, battery configuration and environmental protection requirements before outdoor installation. These dimensions do not establish a wind-load or protection certification.
Verify recording before unattended use
Check Wi-Fi access, GPS/time information and storage status. Capture a daytime and nighttime trial sequence and verify that files can be retrieved. The specified storage is 512 GB; retention depends on image size, recording interval and the configured full-disk policy. Confirm that policy before unattended operation.
Use the approved cleaning and condensation-management procedure for the installed enclosure. This is a planning guide; it does not replace model-specific electrical, mounting or environmental instructions.
